A Personal DIY Story

From Chapel to Home

Documenting the hands-on conversion of a historic chapel into our future living space.

The Beginning

Why We Chose This Chapel

A completely spontaneous decision led us to buy a dilapidated, abandoned chapel instead of making an offer on a conventional house. Sure, the garden was a wild jungle, the windows were rotten, and the gutters were long gone—but the moment I saw it, I just thought it was such a beautiful, striking building. Despite all the neglect, I knew instantly that it would make a absolutely lovely home, and we couldn't resist the opportunity to create it by hand.

Follow the Conversion Journal

Taming the Jungle

Initial cleanup efforts focused on the wildly overgrown garden, which featured brambles reaching roof height on a hidden scaffold tower, alongside accumulated rubbish and rubble.

The garden clean up alone took around 2 weeks, using a small chainsaw, lopper, hedge cutters and strimmer, and produced 2 skips of rubbish, and revealed 20 chairs, around 200 plant pots, 3 compost bins, 4 pallets and a sewing machine!

Repairing the Masonry

Exterior work involved restoring brickwork and replacing missing guttering and downpipes and top-course bricks.

Indoors, cracked plaster was removed, and structural masonry was stabilized using Helifix bars and Anchorset.

Work in the main church hall has so far been limited to clearing out the huge amount of clutter, followed by structural repairs to the brickwork, replacing the 4 windows, complete rewiring, and replastering the internal wall. I enlisted help from a friend, Paul, with plastering this huge 12m x 3.6m wall.

Later, I laid 300mm of loft insulation in the 54 square-meter main loft.

The brickwork of the main hall is a unique triple-skin type of construction, with a solid 9" double brick outer layer, a small 3" cavity, then a further single brick inner layer.

Working alone—or with occasional help from family—the only way to tackle a project of this size was to focus on one room at a time.

Room 1: The Small Bedroom

The smallest bedroom suffered severe water damage from a failed downpipe and rotten window frame. Remediation required stripping compromised plaster and completing a full electrical rewire. Additional updates included replacing the window, lowering the high ceiling, adding insulation, and re-plastering.

After completing the small bedroom, we had all nine windows replaced—including the massive Gothic arches—and fitted a new back door.

Room 2: The Second Bedroom & Fireplace

The second room, intended to be divided into a hallway, bathroom, and bedroom, required extensive ceiling and wall repairs due to collapsed layers of old boarding sections and heavy clutter. The space was rewired, insulated, and resurfaced, alongside uncovering a bricked-up fireplace to install a new hearthstone and cleaning and re-instating the old log-burning stove which I discovered in situ.

Building the Bathroom (Or So I Thought...)

Next, I started on the stud walls to create the new bathroom area. I went into it thinking this bit would be easy and straightforward. It wasn't.

What started as a simple floorboard patch under a damp window turned into a major structural fix. After peeling back the boards, I uncovered severely rotted main joists and some incredibly poor "sistered" repairs left behind by previous owners. Compounding the issue, a buildup of old rubble and debris was completely bridging the damp-proof course.

There was nothing else for it-I completely gutted the floor void, cleared out the debris, and rebuilt the sleeper walls to start entirely fresh. While it was a massive, unexpected setback, tearing the floor open did provide a perfect opportunity. Before closing it back up, I was able to comfortably install all the new water and heating pipework, lay down the main bath drainage, clear out the blocked airbricks, and fully insulate the subfloor.

For the ceilings, I left the high, damaged original ceilings intact to serve as an extra thermal barrier before installing a dropped ceiling with 300mm of mineral wool and vapour control boards.

After routing new electrics and core-drilling for rigid ventilation ducting. Next, I built the stud walls using moisture-resistant green boards filled with acoustic and thermal insulation, finishing the surfaces with a Bluegrit primer and a smooth plaster skim.

Although the aim was to tackle one room at a time, the construction of the bathroom created one of the hallway walls. The natural progression from here was to construct the opposing wall. This wall acted as the partition that finished off the second bedroom.

I installed a loft hatch in the hallway and then constructed the stud wall. As with the other stud walls, they were filled with acoustic and thermal insulation. I extended the ring main to include a high-level socket for a tv, and a coaxial socket.

The wall was built under, and helped conceal an RSJ, while forming two storage cupboards.

At the end of the newly created hallway is the old kitchen; this room is going to be a utility room. For the time being, I'm limited to what I can do in here because it's the only area which has hot and cold water and where we make the much needed pots of tea!

So far, I've removed cracked plaster to reveal and repair some masonry damage. I had a new window and back door installed, however the brickwork above the door is loose and requires a lintel. In the past, the floor in this room has been raised which most likely explains why the lintel is absent. I will lower the floor back to its original level and lower the door before making structural repairs.

I have lowered the ceiling, as I did in other rooms, and filled the sub-loft void with 300mm of insulation.